Calculating SkillPort 7.2 Due Dates in SkillPort 7.3

Note: Upon upgrade to SkillPort 7.3, all SkillPort 7.2 restarts are automatically set to Recurring by Completion Date. To set your existing restarts to be Recurring by Due Date recurrences, these must be handled manually after the upgrade completes.

If these are selected in the 7.2 Add to MY PLAN window...

then this option should be selected in 7.3.

Other Considerations

Check box - Selected Recurrence check box

and

Due Date: Fixed Date

Recurring by completion date

  • The 7.2 Fixed Date is set to the 7.3 Initial Due Date.
  • The SkillPort 7.2 Assignment Date is used in the calculation of the SkillPort 7.3 Period After Assignment using the following formula:
  • The 7.2 Fixed Date (i.e. January 1, 2012) minus the SkillPort Assignment Date (i.e. December 1, 2011) equals the 7.3 Period After Assignment (i.e. 30 days).
  • If you had a monthly reassignment set in 7.2, the 7.3 due date is recalculated based on a 30-day month.

    Example:

    • In 7.2, the Period after assignment is 2 months.
    • In 7.3, the Period after assignment is 60 days (30 days per month).

Recurrence check box (unselected)

and

Due Date: Period after Assignment

Recurring by completion date

  • The 7.3 Initial Due Date is set to the same value as the 7.2 Period after Assignment.
  • If you had a monthly reassignment set in 7.2, the 7.3 due date is recalculated based on a 30-day month.

    Example:

    • In 7.2, the Period after assignment is 2 months.
    • In 7.3, the Period after assignment is 60 days (30 days per month).

Recurrence check box

Non Recurring