Displays a summary of user statistics by learning program or Skillsoft Bootcamp course.
Note: If an assigned Learning Program includes an empty folder, the Status and Percent Started values may be incorrectly reported as "Started", and "100%".
Possible Values: valid numeric value with the following maximum value for each report_date_period:
Days - 9999
Weeks - 999
Months - 999
Years - 99
Default Value: 1
BCS Parameter: report_to_date (optional)
If you are using report_date periods, report_to_date=true will include all activity for the requested periods plus activity in the current period up to the current date and time. If report_to_date=false, the report will only include activity for the requested periods.
Possible Values: true or false
Default Value: true
Example:
If report_to_date = true, the end date is always the date the report is run, up to and including the most recent database refresh.
If report_to_date = false, the end date is the last day of the previous interval. For instance, if today is December 31, the ‘Previous [n] Months’ ends on November 30 and the ‘Previous [n] Years’ ends on December 31 of the prior year.
BCS Parameter: display_units (optional and used in chart templates only)
Description: Allows the user to select one event and then filter that event by date.
Control Type: Single-select
BCS Parameter: date_filter_field
Possible Values: first_access_date, last_access_date, completion_date, asset_enrolled_date
Static Dates
To enter static dates, use the following parameters with a specific date for the filter_start_date and filter_end_date parameters:
BCS Parameter: filter_start_date (optional)
Possible Values: <date_value in the format MM/DD/YYYY>
Default Value: the first day of the preceding calendar month
BCS Parameter: filter_end_date (optional)
Possible Values: <date_value in the format MM/DD/YYYY>
Default Value: 'now', or the last successful database refresh
Note: Default start and end dates will only be used if a date_filter_field value is entered and the date values are left blank. In this instance, the date values are dynamic and will update each time the report is run.
Dynamic Dates
For dynamic dates that change each time the report is run, use the following parameters:
BCS Parameter: filter_date_period (required)
Possible Values: 1 (Days), 2 (Weeks), 3 (Months), 4 (Years)
Possible Values: valid numeric value with the following maximum value for each report_date_period:
Days - 9999
Weeks - 999
Months - 999
Years - 99
Default Value: 1
Filter to Date
If you are using filter_date periods, filter_to_date=true will include all activity for the requested periods plus activity in the current period up to the current date and time. If filter_to_date=false, the report will only include activity for the requested periods.
BCS Parameter: filter_to_date (optional)
Possible Values: true or false
Default Value: true
Example:
If filter_to_date = true, the end date is always the date the report is run, up to and including the most recent database refresh.
If filter_to_date = false, the end date is the last day of the previous interval. For instance, if today is December 31, the ‘Previous [n] Months’ ends on November 30 and the ‘Previous [n] Years’ ends on December 31 of the prior year.
Description: Provides the ability to select one, or many users or groups.
Note: The maximum number of users or groups selected for each report cannot exceed 1000.
Control Type: Multi-select
BCS Parameter: user_list
Possible Values: CSV list of <username> values
Default Value: All
BCS Parameter: group_list
Possible Values: CSV list of <group_orgcode> values
Default Value: All
Note: In some templates the Group or the User filter may not be available. For instance, if the report is group specific then the user filter may be disabled.
Description: The percentage of users enrolled in a Learning Program who have completed the Learning Program based on the Learning Program completion rules, as of the End Date of the Activity Date Range.
Description: The number of users against a Learning Program that have a status of Enrolled, Started, Withdrawn, Completed, Pending Approval, or Denied Approval.